AC Pipe Replacement Program

Project Type
Construction
Project Status
Current
Project Category
Water
Project Area
Colwood
Estimated Cost
$3,000,000
Estimated Timeline
01-Mar-2023 to 31-Dec-2024 (10 months)
Contracted To / Performed By
Colquitz Engineering (Consulting Engineers)

This ongoing program is in place for ultimate replacement of asbestos cement pipe in the Juan de Fuca Water Distribution System. Pipe replacement is prioritized based on risk of failure and other work in the region.

The 2024 replacement program includes:

  • Milburn Drive
  • Lagoon Road
  • Ocean Boulevard
  • Charters Road
  • Painter Road
  • Sooke Road
  • Belvista Place
Was this page helpful?

Feedback details

You will NOT receive a reply because this form is anonymous. To get an answer to a question, email us at webdesk@crd.bc.ca

Last Updated:
Abstract teal and navy blue butterfly illustrations.

Territorial Acknowledgement

The CRD conducts its business within the Territories of many First Nations, all of whom have a long-standing relationship with the land and waters from time immemorial that continues to this day. Statement of Reconciliation