Goldstream Water Treatment Plant - Replacement of UV System

Project Type
Construction
Project Status
Current
Project Category
Water
Project Area
Langford
Estimated Cost
$8,730,000
Estimated Timeline
01-Sep-2021 to 28-Feb-2026 (6 months)
Contracted To / Performed By
Associated Engineering (BC)

The Goldstream Water Treatment Plant uses UV and chemical disinfection to provide safe drinking water to approximately 365,000 people in Victoria, Saanich, Oak Bay, Esquimalt, Central Saanich, North Saanich, Sidney, Highlands, Colwood, Langford and Metchosin. The existing UV disinfection infrastructure is reaching end-of–life status are requires replacement with modern, integrated and efficient equipment that meets Island Health and CRD requirements.

Conceptual design is underway with construction anticipated to commence in 2024.

Was this page helpful?

Feedback details

You will NOT receive a reply because this form is anonymous. To get an answer to a question, email us at webdesk@crd.bc.ca

Last Updated:
Abstract teal and navy blue butterfly illustrations.

Territorial Acknowledgement

The CRD conducts its business within the Territories of many First Nations, all of whom have a long-standing relationship with the land and waters from time immemorial that continues to this day. Statement of Reconciliation